
Structural steelwork · Sfax · Proplast · 2026
SKCMM handled the manufacturing and erection of the steel structure for the PROPLAST plastic injection factory covering 7,500 m² in Sfax.
Completed within 120 days, this project confirms our ability to meet industrial requirements on a controlled timeline, from workshop fabrication to on-site erection.
Period: January 2026 – April 2026
Client: Proplast
Location: Sfax
Category: Metal frames
